
Prior to commencement
|

Stripped to the framework, Fully re-glued, Strengthend
|

Top arms need be built up
|

Cardboard layer for level surface
|

Inside back needs to be re-sprung
|

Inside back is re-sprung with new hessian, and polycord border
|

Inside back Re-Sprung
|

New foam for inside back
|

New foam for arms compiled from 3 sections
|

Inside back and arms are upholstered in leather
|

New coil springs are set into place
|

New hessian is sewn to the springs
|

Layer of foam
|

Finished product
|

Finished product
|